Selected assignments

Real projects. Lasting impact.

2026BTP / HSSE

Andekaleka

Technical, economic and environmental feasibility study for the reinforcement of the Andekaleka hydroelectric dam — Environmental and Social Impact Assessment (EIES) component.

Groupement VIA Consulting / MEC / Zollet

2025BTP / HSSE

RNS10

Management, control and supervision of RNS10 rehabilitation works (Ambovombe–RNP7) and construction of weighing stations, Lot 2. Provision of 3 environmental specialists for E&S monitoring.

SGS Sénégal – SGS Madagascar

12/2021BTP / HSSE

RNS5

Development and paving of Secondary National Road 5 (RNS5) between Soanierana Ivongo and Mananara Nord, Soanierana Ivongo–Vahibe section. 4-person environmental team.

EGIS INFRAMAD

04/2021BTP / HSSE

Ikopa & Sisaony

Riverbank reinforcement on the Ikopa and Sisaony rivers, and dredging of canal C3 — Integrated Urban Development and Resilience Project (PRODUIR).

EGIS INFRAMAD

2008Protected Area

Tsitongambarika

Establishment and management of the Tsitongambarika Protected Area: creation of 12 management transfers, renewal of 43 transfers, capacity building for 55 COBAs, management of a 15-person team.

Association Asity Madagascar

Since 2008

Experience, one assignment at a time.

The team’s assignments since 2008. Open a reference to read its context.

2026Andekaleka Dam Reinforcement — EIES ComponentOngoing

Groupement VIA Consulting / MEC / Zollet · June 2026 – present

Technical, economic and environmental feasibility study for the reinforcement of the Andekaleka hydroelectric dam — Environmental and Social Impact Assessment (EIES) component.

Andekaleka

View project
2026Ikalamavony Rural Track Rehabilitation — DEFIS/UNOPS Project

Groupement ADTR / PERS BTP · January 2026 – April 2026

Technical studies (APS/APD/DAO) and environmental and social impact assessments for the sustainable rehabilitation of rural tracks (lots 3 and 4), Ikalamavony district — DEFIS/UNOPS project.

UNOPS

Ikalamavony

2026RIP 118 Impact Assessment — Bevoay/Ampasimena

Artelia Madagascar · January 2026 – April 2026

Environmental and social impact assessment of RIP 118 linking Bevoay and Ampasimena (27 km).

RIP 118, Bevoay–Ampasimena

2025RNS10 Road Rehabilitation — AmbovombeOngoing

SGS Sénégal – SGS Madagascar · January 2025 – present

Management, control and supervision of RNS10 rehabilitation works (Ambovombe–RNP7) and construction of weighing stations, Lot 2. Provision of 3 environmental specialists for E&S monitoring.

World Bank (IDA Credit)

RNS10, Ambovombe

View project
2025Port of Mahajanga and RNP4 Restoration

Société CRBC · January 2025 – June 2026

Emergency rehabilitation works at the Port of Mahajanga and periodic maintenance of the RNP4 Antananarivo–Mahajanga road (Lot 1). Preparation of ESMP/PHS/PPES/PCEV documents and provision of an environmental team.

World Bank (IDA Credit)

Port de Mahajanga, RNP4

2024Regional Road Improvement — RN44

PACT / MTP · June 2024 – July 2025

Control and supervision of improvement works on regional, communal and unclassified roads along RN44, split into three lots.

World Bank (IDA)

RN44

2024Manakara and Farafangana Urban Road Rehabilitation

Société WIETC - ZTM · June 2024 – June 2025

Rehabilitation of urban roads in Manakara (Lot 2) and Farafangana (Lot 3). Preparation of the ESMP and site-specific PPES.

World Bank (IDA Credit)

Manakara, Farafangana

2024RN13 Road Rehabilitation — Ambovombe/Tolagnaro

Groupement CIRA SAS / SETEC INTERNATIONAL / SETEC MADAGASCAR / ASA TARATRA · March 2024 – May 2026

Control and supervision of RN13 rehabilitation works linking Ambovombe and Tolagnaro (two contracts). Provision of environmental specialists for E&S management monitoring.

EIB / European Union

RN13, Ambovombe–Tolagnaro

2024Oronjia Protected Area Business Plan

Missouri Botanical Garden Madagascar Program · January 2024 – February 2025

Preparation of the Oronjia Protected Area Business Plan and the Delonix velutina conservation plan.

Aire Protégée Oronjia

2023Mandrare–Sampona Pipeline Rehabilitation — MIONJO

Société WIETC · November 2023 – January 2024

Rehabilitation works on the Mandrare–Sampona pipeline — MIONJO project. Preparation of the ESMP and provision of an environmental specialist.

World Bank (IDA Credit 7510-M)

Pipeline Mandrare–Sampona

2023Post-Cyclone Electrical Network Restoration

CERC - PDDR · June 2023 – July 2024

Control and supervision of design, supply and installation works to restore electricity distribution networks after cyclone damage.

2023Ikopa and Sisaony Riverbank Reinforcement — PRODUIR

EGIS INFRAMAD · January 2023 – January 2024

Control and supervision of riverbank reinforcement works on the Ikopa and Sisaony rivers — Integrated Urban Development and Resilience Project (PRODUIR), rehabilitation of damaged dykes.

World Bank (PRODUIR)

Ikopa, Sisaony

2022RNP6 Post-Cyclone Restoration — PDDR

ISO Construction · October 2022 – January 2024

Post-cyclone infrastructure restoration on the RNP6 road (Ambondromamy–Ambanja) — Sustainable Road Development Project (PDDR), CERC component. 4-person environmental team.

World Bank (IDA Credit)

RNP6, Ambondromamy–Ambanja

2022RNS5 Post-Cyclone Restoration — PDDR

Bureau d'Étude Harry · October 2022 – November 2023

Control and supervision of post-cyclone restoration works on the RNS5 road (Tamatave–Foulepointe) — PDDR, CERC component. 2-person environmental team.

World Bank (IDA Credit)

RNS5, Tamatave–Foulepointe

2022Kalanoro Protected Area Management Plan

Ecovision Village · September 2022 – June 2023

Preparation of the Management and Development Plan for the Kalanoro Protected Area, Andasibe — biological inventory, socioeconomic data and zoning.

Aire Protégée Kalanoro, Andasibe

2022Darses Quay Environmental Study — Port of Toamasina

EGIS INFRAMAD · June 2022 – September 2022

Environmental and social study for the construction of the new Darses quay at the Port of Toamasina.

SPAT

Port de Toamasina

2022Environmental Commitment Programme — Antanantanana Dyke

Armonia Natura · May 2022 – July 2022

Study for the preparation of an Environmental Commitment Programme (PREE) — dyke raising and widening works at Antanantanana, Iarinarivo rural commune — PRODUIR project.

Antanantanana, Iarinarivo

2022Cyclone Batsirai Impact Assessment — Ranomafana and Andringitra

Association KOLOSERA · May 2022 – July 2022

Assessment of Cyclone Batsirai's impact on the Ranomafana and Andringitra protected areas (UNESCO World Heritage) on biodiversity and natural habitats.

Ranomafana, Andringitra

2022RN12A Paving and Manambondro Bridge

SGS Madagascar – SGS Sénégal · March 2022 – June 2025

Paving works on 35 km of RN12A between Somisika and Masianaka and construction of a bridge at Manambondro. 3-person environmental team.

World Bank (IDA)

RN12A, Somisika–Masianaka

2021RNS5 Development — Soanierana Ivongo / Mananara NordOngoing

EGIS INFRAMAD · December 2021 – present

Development and paving of Secondary National Road 5 (RNS5) between Soanierana Ivongo and Mananara Nord, Soanierana Ivongo–Vahibe section. 4-person environmental team.

RNS5, Soanierana Ivongo–Mananara Nord

View project
2021RN12 Impact Assessment — Tolagnaro/Vangaindrano

Groupement SERT / ECODEV · September 2021 – December 2021

Environmental impact assessment for the rehabilitation of RN12 connecting tracks between Tolagnaro and Vangaindrano.

RN12, Tolagnaro–Vangaindrano

2021RN10 Impact Assessment — Andranovory/Ambovombe

Groupement SERT / ECODEV · September 2021 – October 2021

Environmental impact assessment for the rehabilitation of RN10 linking Andranovory and Ambovombe.

RN10, Andranovory–Ambovombe

2021RN31 Impact Assessment — Ankazobetsihay/Andapa

Groupement SERT / ECODEV · September 2021 – October 2021

Environmental impact assessment for the rehabilitation of RN31 linking Ankazobetsihay and Andapa.

RN31, Ankazobetsihay–Andapa

2021Mangoky Bridge Impact Assessment — RN9

EGIS INFRAMAD / TAEP · September 2021 – December 2021

Environmental impact assessment for the construction of the Mangoky bridge (Bevoay bridge) on RN9, including its access roads.

Pont de Mangoky, RN9

2021TANAMASOANDRO City Impact Assessment

Armonia Natura · June 2021 – January 2022

Environmental and social impact assessment for the establishment of the new TANAMASOANDRO city at Imerintsiatosika.

Imerintsiatosika

2021Ikopa and Sisaony Riverbank Works — PRODUIROngoing

EGIS INFRAMAD · April 2021 – present

Riverbank reinforcement on the Ikopa and Sisaony rivers, and dredging of canal C3 — Integrated Urban Development and Resilience Project (PRODUIR).

World Bank (IDA Credit 6245)

Ikopa, Sisaony

View project
2021Andohatapenaka Flyover Impact Assessment

Armonia Natura · February 2021 – July 2022

Environmental and social impact assessment for the construction of the Andohatapenaka flyover.

Andohatapenaka

2020RN5A Road Rehabilitation

Société CRBC · December 2020 – September 2022

Rehabilitation of National Road N°5 (RN5A) — financed by Chinese funds and internal own resources.

Chinese Fund

RN5A

2020RN9 Development and Paving — Analasosa/Bevoay

Société CRBC · December 2020 – September 2023

Development and paving of RN9 linking Analasosa and Bevoay.

BADEA

RN9, Analasosa–Bevoay

2020RN44 Paving — Section 2 — PACT

Société CRBC · November 2020 – August 2023

Paving of RN44, section 2 — Transport Connectivity Support Project (PACT). 3 senior environmental specialists.

World Bank (IDA-6505-MG)

RN44

2020Andriantompoiray Quarry Impact Assessment

Armonia Natura (pour SCAT) · November 2020 – April 2021

Environmental and social impact assessment for the operation of a quarry at Andriantompoiray–Ambatomirahavavy.

Andriantompoiray–Ambatomirahavavy

2020Manantantely Business Center Construction

Association Asity Madagascar · November 2020 – January 2021

Construction of a Business Center at Manantantely–Tolagnaro (poultry house, refectory, sanitation facilities).

Manantantely, Tolagnaro

2020Oronjia Protected Area Management Plan Update

Missouri Botanical Garden – Madagascar Conservation Program · July 2020 – December 2021

Update of the Oronjia Protected Area Management and Development Plan.

Aire Protégée Oronjia

2020Nosy Be Road Rehabilitation

Société SINOHYDRO · May 2020 – November 2020

Road rehabilitation in Nosy Be, Diana region (V1, V2, Amporaha axes and crater roads) — Integrated Growth Pole.

Nosy Be

2020Antetezambato Dam Impact Assessment

Armonia Natura · February 2020 – December 2020

Environmental and social impact assessment for the Antetezambato hydroelectric dam project.

Antetezambato

2020GIS Training — PFGAP DIANA

Association Fanamby · January 2020 – January 2020

Capacity building for PFGAP DIANA members on GIS (ArcGIS 10.6).

Région DIANA

2020Statistical Processing Training — PFGAP DIANA

Association Fanamby · January 2020 – January 2020

Capacity building for PFGAP DIANA members on statistical processing of protected area data.

Région DIANA

2019Ecological Monitoring — Andavakoera Andrafiamena Protected Area

Association Fanamby · December 2019 – December 2019

Capacity building for local communities on ecological monitoring of the Andavakoera Andrafiamena Protected Area.

Aire Protégée Andavakoera Andrafiamena

2019Ecotourism Business Plan — Ampasy Ivohibe

Association Asity Madagascar · August 2019 – December 2019

Preparation of the Business Plan for community ecotourism development at Ampasy Ivohibe, Tsitongambarika.

Ampasy Ivohibe, Tsitongambarika

2019Antananarivo Access and Sanitation — DAQP III

EGIS INFRAMAD · July 2019 – March 2021

Control and supervision of the construction and rehabilitation of mobility and sanitation infrastructure — Antananarivo Access and Sanitation Project, Phase III (DAQP III).

AFD

Antananarivo

2018Topographic Survey — Access Roads

EGIS INFRAMAD · March 2018 – April 2018

Topographic survey of the study corridor for roads and lanes.

2018Plague Response Plan — Haute Mahatsiatra

Direction Régionale de l'Environnement, de l'Écologie et des Forêts — Haute Mahatsiatra · February 2018 – March 2018

Implementation of the plague response action plan in the Haute Mahatsiatra region: awareness raising, stakeholder training and disinfection of infected premises.

Haute Mahatsiatra

2017Torotorofotsy NPA Impact Assessment

Asity Madagascar · April 2017 – July 2017

Preparation of the environmental impact assessment file for the establishment of the Torotorofotsy New Protected Area.

Ambatovy

NAP Torotorofotsy

2016Hôtel Étoiles Ivato Rodent Control

RVA Consulting pour la Société d'Exploitation Hôtelière d'Ivato (SEHI) · November 2016 – November 2016

Rodent control works at Hôtel Étoiles Ivato: rat eradication and site improvements to prevent new intrusions.

Hôtel Étoiles, Ivato

2015Biological Inventory — Pine Plantation

VIMA Wood · 2015

Rapid biological inventory of fauna and flora in Vision Madagascar's pine plantation area.

2015NAP CMI Ecological Restoration Plan

Asity Madagascar · 2015

Spatial analysis of ecosystem degradation in the CMI New Protected Area and preparation of an ecological restoration plan.

2014Business Plan — Geranium Essential Oil

Association FIFARM · 2014

Preparation of the Business Plan for large-scale geranium essential oil production, Vakinankaratra region.

Vakinankaratra

2014Management Plan — Ankarena Nord and Andranolava

WWF Madagascar Indian Ocean Program · 2014

Preparation of the Management and Development Plan for the Ankarena Nord and Andranolava communities, Ivohibe district, ahead of management transfer.

Ivohibe

2012Antsoha NPA Establishment

Lemuria Land Parks / Ileiry Geospatial Services · 2012

Establishment of the Antsoha New Protected Area: public consultation, management and development plan, environmental impact assessment.

NAP Antsoha

2012Natural Resource Inventory — Anjanozano Forest

Service d'Appui à la Gestion de l'Environnement (SAGE) · 2012

Inventory of terrestrial natural resources in the Anjanozano classified forest, ahead of establishing a new protected area.

Forêt classée d'Anjanozano

2008Tsitongambarika Protected Area ManagementOngoing

Association Asity Madagascar · September 2008 – present

Establishment and management of the Tsitongambarika Protected Area: creation of 12 management transfers, renewal of 43 transfers, capacity building for 55 COBAs, management of a 15-person team.

Aire Protégée Tsitongambarika

View project

Our partners.

Engineering firms, businesses and associations, brought together here by the work we have done with them.

Forests & biodiversity

  • Missouri Botanical Garden
  • Asity Madagascar / BirdLife
  • WWF Madagascar
  • Association Fanamby
  • Association KOLOSERA
  • Ecovision Village

Studies & engineering

  • Artelia Madagascar
  • SGS Madagascar
  • Egis Inframad
  • Groupement CIRA / SETEC / ASA Taratra
  • Groupement VIA Consulting / MEC / Zollet
  • Bureau d'Étude Harry

Roads & construction

  • Société CRBC
  • Société SINOHYDRO
  • Société WIETC - ZTM
  • Groupement ADTR / PERS BTP
  • PACT / MTP
  • ISO Construction

Resources & territories

  • Groupement SERT / ECODEV
  • Armonia Natura
  • Association FIFARM
  • VIMA Wood
  • Lemuria Land Parks / Ileiry Geospatial
  • SAGE

Health & living spaces

  • DREEF Haute Mahatsiatra
  • SEHI (Ivato)