Andekaleka
Technical, economic and environmental feasibility study for the reinforcement of the Andekaleka hydroelectric dam — Environmental and Social Impact Assessment (EIES) component.
Groupement VIA Consulting / MEC / Zollet
MadagascarSelected assignments
Technical, economic and environmental feasibility study for the reinforcement of the Andekaleka hydroelectric dam — Environmental and Social Impact Assessment (EIES) component.
Groupement VIA Consulting / MEC / Zollet
Management, control and supervision of RNS10 rehabilitation works (Ambovombe–RNP7) and construction of weighing stations, Lot 2. Provision of 3 environmental specialists for E&S monitoring.
SGS Sénégal – SGS Madagascar
Development and paving of Secondary National Road 5 (RNS5) between Soanierana Ivongo and Mananara Nord, Soanierana Ivongo–Vahibe section. 4-person environmental team.
EGIS INFRAMAD
Riverbank reinforcement on the Ikopa and Sisaony rivers, and dredging of canal C3 — Integrated Urban Development and Resilience Project (PRODUIR).
EGIS INFRAMAD
Establishment and management of the Tsitongambarika Protected Area: creation of 12 management transfers, renewal of 43 transfers, capacity building for 55 COBAs, management of a 15-person team.
Association Asity Madagascar
Since 2008
The team’s assignments since 2008. Open a reference to read its context.
Technical, economic and environmental feasibility study for the reinforcement of the Andekaleka hydroelectric dam — Environmental and Social Impact Assessment (EIES) component.
View projectTechnical studies (APS/APD/DAO) and environmental and social impact assessments for the sustainable rehabilitation of rural tracks (lots 3 and 4), Ikalamavony district — DEFIS/UNOPS project.
UNOPS
Environmental and social impact assessment of RIP 118 linking Bevoay and Ampasimena (27 km).
Management, control and supervision of RNS10 rehabilitation works (Ambovombe–RNP7) and construction of weighing stations, Lot 2. Provision of 3 environmental specialists for E&S monitoring.
World Bank (IDA Credit)
View projectEmergency rehabilitation works at the Port of Mahajanga and periodic maintenance of the RNP4 Antananarivo–Mahajanga road (Lot 1). Preparation of ESMP/PHS/PPES/PCEV documents and provision of an environmental team.
World Bank (IDA Credit)
Control and supervision of improvement works on regional, communal and unclassified roads along RN44, split into three lots.
World Bank (IDA)
Rehabilitation of urban roads in Manakara (Lot 2) and Farafangana (Lot 3). Preparation of the ESMP and site-specific PPES.
World Bank (IDA Credit)
Control and supervision of RN13 rehabilitation works linking Ambovombe and Tolagnaro (two contracts). Provision of environmental specialists for E&S management monitoring.
EIB / European Union
Preparation of the Oronjia Protected Area Business Plan and the Delonix velutina conservation plan.
Rehabilitation works on the Mandrare–Sampona pipeline — MIONJO project. Preparation of the ESMP and provision of an environmental specialist.
World Bank (IDA Credit 7510-M)
Control and supervision of design, supply and installation works to restore electricity distribution networks after cyclone damage.
Control and supervision of riverbank reinforcement works on the Ikopa and Sisaony rivers — Integrated Urban Development and Resilience Project (PRODUIR), rehabilitation of damaged dykes.
World Bank (PRODUIR)
Post-cyclone infrastructure restoration on the RNP6 road (Ambondromamy–Ambanja) — Sustainable Road Development Project (PDDR), CERC component. 4-person environmental team.
World Bank (IDA Credit)
Control and supervision of post-cyclone restoration works on the RNS5 road (Tamatave–Foulepointe) — PDDR, CERC component. 2-person environmental team.
World Bank (IDA Credit)
Preparation of the Management and Development Plan for the Kalanoro Protected Area, Andasibe — biological inventory, socioeconomic data and zoning.
Environmental and social study for the construction of the new Darses quay at the Port of Toamasina.
SPAT
Study for the preparation of an Environmental Commitment Programme (PREE) — dyke raising and widening works at Antanantanana, Iarinarivo rural commune — PRODUIR project.
Assessment of Cyclone Batsirai's impact on the Ranomafana and Andringitra protected areas (UNESCO World Heritage) on biodiversity and natural habitats.
Paving works on 35 km of RN12A between Somisika and Masianaka and construction of a bridge at Manambondro. 3-person environmental team.
World Bank (IDA)
Development and paving of Secondary National Road 5 (RNS5) between Soanierana Ivongo and Mananara Nord, Soanierana Ivongo–Vahibe section. 4-person environmental team.
View projectEnvironmental impact assessment for the rehabilitation of RN12 connecting tracks between Tolagnaro and Vangaindrano.
Environmental impact assessment for the rehabilitation of RN10 linking Andranovory and Ambovombe.
Environmental impact assessment for the rehabilitation of RN31 linking Ankazobetsihay and Andapa.
Environmental impact assessment for the construction of the Mangoky bridge (Bevoay bridge) on RN9, including its access roads.
Environmental and social impact assessment for the establishment of the new TANAMASOANDRO city at Imerintsiatosika.
Riverbank reinforcement on the Ikopa and Sisaony rivers, and dredging of canal C3 — Integrated Urban Development and Resilience Project (PRODUIR).
World Bank (IDA Credit 6245)
View projectEnvironmental and social impact assessment for the construction of the Andohatapenaka flyover.
Rehabilitation of National Road N°5 (RN5A) — financed by Chinese funds and internal own resources.
Chinese Fund
Development and paving of RN9 linking Analasosa and Bevoay.
BADEA
Paving of RN44, section 2 — Transport Connectivity Support Project (PACT). 3 senior environmental specialists.
World Bank (IDA-6505-MG)
Environmental and social impact assessment for the operation of a quarry at Andriantompoiray–Ambatomirahavavy.
Construction of a Business Center at Manantantely–Tolagnaro (poultry house, refectory, sanitation facilities).
Update of the Oronjia Protected Area Management and Development Plan.
Road rehabilitation in Nosy Be, Diana region (V1, V2, Amporaha axes and crater roads) — Integrated Growth Pole.
Environmental and social impact assessment for the Antetezambato hydroelectric dam project.
Capacity building for PFGAP DIANA members on GIS (ArcGIS 10.6).
Capacity building for PFGAP DIANA members on statistical processing of protected area data.
Capacity building for local communities on ecological monitoring of the Andavakoera Andrafiamena Protected Area.
Preparation of the Business Plan for community ecotourism development at Ampasy Ivohibe, Tsitongambarika.
Control and supervision of the construction and rehabilitation of mobility and sanitation infrastructure — Antananarivo Access and Sanitation Project, Phase III (DAQP III).
AFD
Topographic survey of the study corridor for roads and lanes.
Implementation of the plague response action plan in the Haute Mahatsiatra region: awareness raising, stakeholder training and disinfection of infected premises.
Preparation of the environmental impact assessment file for the establishment of the Torotorofotsy New Protected Area.
Ambatovy
Rodent control works at Hôtel Étoiles Ivato: rat eradication and site improvements to prevent new intrusions.
Rapid biological inventory of fauna and flora in Vision Madagascar's pine plantation area.
Spatial analysis of ecosystem degradation in the CMI New Protected Area and preparation of an ecological restoration plan.
Preparation of the Business Plan for large-scale geranium essential oil production, Vakinankaratra region.
Preparation of the Management and Development Plan for the Ankarena Nord and Andranolava communities, Ivohibe district, ahead of management transfer.
Establishment of the Antsoha New Protected Area: public consultation, management and development plan, environmental impact assessment.
Inventory of terrestrial natural resources in the Anjanozano classified forest, ahead of establishing a new protected area.
Establishment and management of the Tsitongambarika Protected Area: creation of 12 management transfers, renewal of 43 transfers, capacity building for 55 COBAs, management of a 15-person team.
View projectEngineering firms, businesses and associations, brought together here by the work we have done with them.